Labs willingly pay more for external data than building internal teams
A data-labeling company scaled from $15M to $100M annually with zero venture capital and maintained profitability, showing that frontier labs prefer external data suppliers to internalizing the work. The real barriers: litigation risk and the complexity of managing a 6,000-person supply chain.
The video won't play here. Listen to the audio instead:
The argument · tap a timestamp to hear it
G2I scaled to $100M revenue in one year—zero VC, still profitable
Gabe Greenberg revealed G2I hit $15M last year, expects $100M this year, with zero fundraising and profitability intact—possibly tripling again next year. Its five or six customers are all frontier labs; the company avoids non-frontier labs, though other funded labs are beginning to come with varying budgets to purchase data.
— Gabe GreenbergOnly one frontier lab built mature internal data infrastructure
Gabe pointed out that only one lab has built data infrastructure and team maturity far beyond others—with mature processes for managing researchers and vendors alike. Other labs mostly still rely on off-the-shelf data, slowly shifting to deep partnerships with external providers because benchmarks have gotten harder, requiring granular data refinement from the instruction stage.
— Gabe GreenbergTask complexity shifted from mass contractors to demanding senior engineers
In 2023 and 2024, projects routinely deployed 6,000 mid-level engineers at modest rates—more gig work. Now they require staff-level senior engineers; dataset construction is highly complex, involving subjective taste judgments, moving away from pure headcount-stacking. Robotics data collection is now repeating this same labor-intensity climb from scratch.
— Gabe GreenbergSWE-bench became standard through timing, not technical superiority
Gabe disclosed a little-known fact: SWE-bench, used as a top-tier industry benchmark for over a year, began as an undergrad project with significant instruction-design flaws from the start. It became standard because first-mover advantage attracted sufficient attention, not because of technical excellence.
— Gabe GreenbergTask difficulty must land in a narrow band between useless and unevaluable
Designing trainable tasks requires hitting a tight band: too hard and it becomes an eval; too easy and training value drops to zero. The ideal sits just a few steps beyond current model capability. Gabe called it both science and art—requiring engineers to multitask with poker-player precision.
— Gabe GreenbergA 6,000-person funnel harbors real risks but only two mega-suppliers exist
Gabe acknowledged the industry faces concrete hazards: a 500-person project typically feeds a 6,000-person funnel, where North Korean labor, supply chain integrity, and CISO strength are legitimate concerns. The industry has already seen contractors working for competing clients simultaneously. Yet even when problems emerge, vendors don't necessarily lose clients—only two or three $1B+ scale vendors exist as substitutes.
— Gabe GreenbergNon-exclusive data is cheaper and more attractive than exclusive rights
Counterintuitively, not all labs demand exclusive data. When the same off-the-shelf dataset sells to four customers, per-customer price drops; exclusivity to one buyer commands a premium. Most labs don't care if their data goes to competitors because for researchers, justifying "how much this budget buys" matters more than secrecy—only the top one or two labs truly care about exclusivity.
— Gabe GreenbergRising data budgets show labs trade compute efficiency for time-to-market
Gabe observed post-training spending rising sharply, with data costs climbing from 2-3% to 4-6% of total compute budgets—he even believes there's a case for 50%, since better data wastes less compute. But labs face time pressure: idle compute burns resources, so they accept "good enough" data rather than waiting for "best-in-class."
— Gabe GreenbergRobotics and 3D models fastest-growing; CAD and chip design severely undersupplied
Looking ahead, Gabe sees robotics and 3D world models as the fastest-growing segments; three years ago, contracts for these lasted three to six months, but now six-month minimums are routine. Law, finance, and computer use offer substantial headroom. Meanwhile, non-software engineering tasks like CAD, mechanical design, and chip design remain severely under-supplied.
— Gabe GreenbergIn their own words · checked verbatim
So you need to make them just hard enough that they're a few steps away from what the model can do today, so they're trainable, and efficiently trainable.
Gabe Greenberg0:00
Uh, last year we did 15 million. Uh, this year will be about 100 million, no VC backing.
Gabe Greenberg1:43
only really one of the labs had a very, very, very mature human data operation.
Gabe Greenberg1:56
I think a lot of people don't understand that SWE-bench, uh, even though it was like the top industry benchmark for like a year plus, uh, was like an undergrad project.
Gabe Greenberg3:49
a researcher in 60 seconds can spend $10 million.
Gabe Greenberg13:13
Quality data is now way more important than an, a 20% price savings.
Gabe Greenberg14:18
If you have 500 people on a project, you're still dealing with 6,000 people at some point in the funnel.
Gabe Greenberg15:23
it's going from the data span of, like, 2% to 3% of your overall compute budget to, like, 4% to 6%.
Gabe Greenberg22:02
Figures
| G2I revenue last year | $15M | 1:43 |
| G2I projected revenue this year | $100M | 1:43 |
| Data spending as % of compute budget | rose from 2-3% to 4-6% | 22:02 |
Glossary
- Jevons paradox
- Efficiency gains that paradoxically increase total consumption and demand
- agentically pilled
- Engineers convinced AI agents enable rapid collaborative development
- off-the-shelf data
- Pre-packaged training data sold to multiple customers, distinct from custom exclusive datasets
- AHT
- Pricing based on average time needed to complete each data task
How to listen
Entrepreneurs trying to understand the training data business model; engineers and investors tracking post-training and RL environment supply chains.